Upper level concrete floor slab with ‘Schok Isokorb’ thermal break at overhang.
Fibre glass wall ties to reduce thermal bridging, with 120mm ‘Kingspan’ PIR foil backed insulation & 50mm cavity.
Nov
05
Thermal blocks in deadworks, 4 courses to reduce thermal bridging, soon to be wrapped in radon barrier to further improve performance.
Oct
31
All dug out with big pile of dirt, for the future terrace.
Oct
22
Scary how easy to knock a house these days.
Oct
06
Radon / Moisture Barrier down, ready for structural slab.
SaveSave
SaveSave
SaveSave
Feb
05
Photo of the original house built in the 1970’s. One of the first houses built in Ardbrack.